<dd id="rw0xn"></dd>

  • <label id="rw0xn"></label>

  • <sup id="rw0xn"><strike id="rw0xn"></strike></sup><label id="rw0xn"></label>
      <th id="rw0xn"></th>
    1. <var id="rw0xn"></var>
        1. <table id="rw0xn"></table>

          <sub id="rw0xn"><meter id="rw0xn"></meter></sub>

          Improving Regulatory Framework and Infrastructure during Nuclear Power Plant Construction Phase

          Project Type

          Technical Cooperation Project

          Project Code

          EGY9050

          Approved Date

          2022.01.01

          Project Status

          Active

          Objectives

          To enhance the capacities of ENRRA staff on regulatory activities (safety assessment, inspection, and authorization) during the construction phase of the El-Dabaa NPP.

          <dd id="rw0xn"></dd>

        2. <label id="rw0xn"></label>

        3. <sup id="rw0xn"><strike id="rw0xn"></strike></sup><label id="rw0xn"></label>
            <th id="rw0xn"></th>
          1. <var id="rw0xn"></var>
              1. <table id="rw0xn"></table>

                <sub id="rw0xn"><meter id="rw0xn"></meter></sub>
                97碰成人国产免费公开视频