          Fukushima Daiichi Status Updates

          On 18 June 2019, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during May, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of May. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2019.06.18

          On 20 May 2019, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during April, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of April. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2019.05.21

          On 19 April 2019, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during March, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of March. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2019.04.23

          On 12 March 2019, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during February, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of February. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2019.03.14

          On 12 February 2019, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during January, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of January. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2019.02.13

          On 11 January 2019, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during December, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of December. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2019.01.11

          On 7 December 2018, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during November which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of November. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2018.12.07

          On 8 November 2018, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during October which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of October. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2018.11.08

          On 10 October 2018, Japan provided the IAEA with a copy of a report on the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during September, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of September. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2018.10.10

          On 5 September 2018, Japan provided the IAEA with a copy of a report the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during August, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of August. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2018.09.10

          On 6 August 2018, Japan provided the IAEA with a copy of a report the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during July, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of  July. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2018.08.06

          On 4 July 2018, Japan provided the IAEA with a copy of a report the discharge record and the seawater monitoring results at the Fukushima Daiichi Nuclear Power Station during June, which the Ministry of Foreign Affairs has sent to all international Missions in Japan.

          The report contains information on discharges from the subdrain and groundwater drain systems, as well as on groundwater bypassing conducted during the month of  June. In both cases, in advance of the action, TEPCO analyzes the quality of the groundwater to be discharged and announces the results. These results confirm that the radiation level of sampled water are substantially below the operational targets set by TEPCO.

          2018.07.04

          <dd id="rw0xn"></dd>

        2. <label id="rw0xn"></label>

        3. <sup id="rw0xn"><strike id="rw0xn"></strike></sup><label id="rw0xn"></label>
            <th id="rw0xn"></th>
          1. <var id="rw0xn"></var>
              1. <table id="rw0xn"></table>

                <sub id="rw0xn"><meter id="rw0xn"></meter></sub>
                97碰成人国产免费公开视频