<dd id="rw0xn"></dd>

  • <label id="rw0xn"></label>

  • <sup id="rw0xn"><strike id="rw0xn"></strike></sup><label id="rw0xn"></label>
      <th id="rw0xn"></th>
    1. <var id="rw0xn"></var>
        1. <table id="rw0xn"></table>

          <sub id="rw0xn"><meter id="rw0xn"></meter></sub>
          • English
          • ???????
          • 中文
          • Fran?ais
          • Русский
          • Espa?ol

          You are here

          Design Basis Reconstitution for Long Term Operation of Nuclear Power Plants

          IAEA-TECDOC-2018

          English IAEA-TECDOC-2018 | 978-92-0-104023-7

          84 pages | 4 figures | € 18.00 | Date published: 2023

          Download PDF (1.49 MB)

          Description

          A nuclear power plant design is the product of the activities of many organizations, and changes to that design will occur due to improvements or technical evolution continuously over the plant's lifetime. Changes can lead to a deterioration, or a loss of original design basis caused by inadequate configuration control processes. This necessitates a reconstitution of the design basis of systems, structures, and components to sustain the safe, reliable, and efficient operation and the plant performance. This publication presents essential elements such as the drivers, goals, methods, roles, responsibilities and interfaces for conducting an effective design basis reconstitution. It also describes current challenges, operating experience, good practices, and lessons learned associated with design basis reconstitution for long term operation. The publication has been written for all those involved in assessing, updating, and implementing design basis reconstitution practices.

          More Information on reusing IAEA copyright material.

          Keywords

          Design Basis Reconstitution, DBR, Long Term Operation, Nuclear Power Plants, Design Basis, DB, Terminology, Associated Definitions, Related Descriptions, Licensing Basis, Documentation, Key Elements, Effective Design Basis Reconstitution, Functional Teams, Task Teams Discovery, Challenges, DBR Activities, Management System, Intellectual Property, Current and Past Methods, Advantages, Disadvantages, Lessons Learned, Applications, Member States, DBR Initiation, Reasons, Drivers, Goals, Constraints, Roles, Responsibilities, Interfaces, Scope Control, Programme and Process, Deliverables, Design Basis Review Database, Operating Experience, Good Practices

          Related publications

          Stay in touch

          Newsletter

          <dd id="rw0xn"></dd>

        2. <label id="rw0xn"></label>

        3. <sup id="rw0xn"><strike id="rw0xn"></strike></sup><label id="rw0xn"></label>
            <th id="rw0xn"></th>
          1. <var id="rw0xn"></var>
              1. <table id="rw0xn"></table>

                <sub id="rw0xn"><meter id="rw0xn"></meter></sub>
                97碰成人国产免费公开视频