<dd id="rw0xn"></dd>

  • <label id="rw0xn"></label>

  • <sup id="rw0xn"><strike id="rw0xn"></strike></sup><label id="rw0xn"></label>
      <th id="rw0xn"></th>
    1. <var id="rw0xn"></var>
        1. <table id="rw0xn"></table>

          <sub id="rw0xn"><meter id="rw0xn"></meter></sub>

          Nuclear Back End Webinar Series 1.10 - Experiences in Setting Up Funds for Back End Liabilities in Nuclear Power Programmes

          Content offered in

          Inglés

          Duration: 1.5 hour

          Enrol

          A fundamental prerequisite for a sustainable waste management programme is the provision of financial resources to cover the costs of the programme. Developing reliable cost estimates and funding mechanisms can be challenging. Waste management does not stop when the nuclear power plant stops operating. A substantial amount of waste is generated by the decommissioning of the nuclear power plant and the disposal of high-level waste or spent fuel generated by the programme can only be done after several decades of cooling in an interim storage facility.

          <dd id="rw0xn"></dd>

        2. <label id="rw0xn"></label>

        3. <sup id="rw0xn"><strike id="rw0xn"></strike></sup><label id="rw0xn"></label>
            <th id="rw0xn"></th>
          1. <var id="rw0xn"></var>
              1. <table id="rw0xn"></table>

                <sub id="rw0xn"><meter id="rw0xn"></meter></sub>
                97碰成人国产免费公开视频